Door Production, Delivery & Installation: The Timeline

TrueFrames offers two-week production and delivery for all our door models and order volumes. Measurement, specification approval, permits and site installation are separate steps to coordinate.

TrueFrames · Project planning guide · Updated September 29, 2026

01

1. Confirm the specification

Select the system, dimensions, finish, frame and hardware. For impact or fire-rated openings, review the required documentation and compatible assembly before placing the order.

02

2. Confirm production and delivery

Doors are manufactured for each order. Ask us to confirm the two-week production and delivery offer for your chosen package, the point at which the schedule begins and the planned delivery date.

03

3. Prepare the site and install

Installation depends on access, opening readiness, the quantity and complexity of work, and any permits or project approvals. A delivery date should not be assumed to be a completed-installation date.